How to approve extra plumbing work in a written change order

Ask for the original scope, the condition that changed it, the added or removed work and the revised price and schedule. Approve the particular change in writing before additional work begins.

Keep the first agreement visible

Save the original estimate before agreeing to any amendment. Ask for a short description of the discovery, the options available and the effect on price and completion time. Reply to the version you actually approve. An invoice that arrives later is a poor place to discover what changed.

In practice

The quote covers replacing the visible valve. Ask for a separate price for damaged pipe behind it.

What belongs in my approval message?

Identify the added work, price or billing basis and any change to the appointment. “Please replace the damaged connector at the additional amount in your revised estimate dated today” is easier to trace than a thumbs-up on a photo.

Keep a traceable revision history

Give each revision a date and a short description such as “damaged wall connection found after cabinet opened.” Ask the plumber to show the added cost, any removed work and the revised total. Confirm whether the appointment or completion date changes. Send approval to the same contact who issued the revision and save the response. At invoicing, match the original price and each approved adjustment line by line before discussing any unexplained balance.

Check which parts of the contract are changing

Open the estimate or home renovation contract and locate the line the contractor wants to change. A sink replacement may include the connections you can see while excluding damaged pipe behind the cabinet. Ask the plumber to explain the discovery and why it affects the original work. Ask which proposed work is necessary to finish the repair and which upgrades you could defer.

Compare the original price, the change and the revised total

A written change order should show what has been added, what has been removed and both amounts. Ask whether the change includes materials, labour, applicable tax and restoration. Confirm any change to the start date, completion date and payment schedule. For renovations that require permits, ask who checks the existing permit and who arranges an inspection if needed. Extra work can affect another trade or your access to the home.

Use written approval for the specific work you accept

Check the revision date, contractor, job reference and person who can approve the work. For a rental property or condo renovation, the person who can open the door may not be authorised to approve an extra charge. Send approval for the particular version and keep the contractor’s reply. If the original estimate and change order differ on the scope, ask for a version that clearly states which work is still included.

Example: a hidden pipe changes the plan

After removing a trap, the plumber finds a split wall connection. The original quote covers a trap replacement with testing. The change order adds a replacement wall connection and a second test. It excludes drywall repair and gives a new total and date. Before approving, ask who closes the wall and how the area will be left. Keep both documents when paying the invoice so the adjusted line can be traced.

What if you do not want to approve additional work?

Ask what can be safely completed under the original contract and whether the contractor needs to leave the job paused. Get an explanation in writing if the invoice already includes a change you did not agree to. Consumer protection rules vary in Canada. Check current guidance for your province and the terms of the contract before settling a disputed charge or assuming a change is binding.

What to check before you sign a change to a home renovation contract

Make sure the change order shows the name of the contractor’s business, the project address and the work to be done. For a home renovation, ask whether the building schedule, a permit or another contractor will be affected. Check whether the cost includes the material allowance or changes it. If the renovation contract already says who is responsible for access and restoration, confirm that the change does not move those responsibilities without a price adjustment.

Prepare the information you need before hiring another trade

Get enough information from the contractor to decide whether you will sign the change or hire another business to do part of the renovation. Ask what work has already been done at the home and what is left. Make sure the plumbing business identifies which part of the building repair can wait. A signed change order should fit the original contract and the renovation project, including the cost, dates and responsibilities.

Compare the signed contract, change order and payment schedule

Before signing, check the new contract total and when the contractor will ask for payment. Save a copy of the signed contract and each signed change. If a business asks to be paid for extra work, match the invoice to the change order number. Where consumer protection information is needed, consult the authority for the province where the renovation took place.

When additional renovation work needs a new approval

Before the contractor starts the extra renovation work, check the total cost, payment date and whether a new approval is required for permits or insurance coverage. It is a good idea to show the work order or signed change order to whoever else is working at the home. Ask who is responsible for the related project work and request a revised schedule if the change affects the finish date.

Use the written contract to identify work done and work still proposed

For major projects, a written contract and a work order will help the homeowner compare work done with the revised cost. Keep one copy of each version to protect yourself if the business and homeowner remember the change differently. If changing needs prompt an upgrade, agree on it separately from work required to complete the original repair.

What if one person approves the change and another pays?

Tell the contractor who can sign for the owner and who needs a copy of the revised agreement. If the business agrees to a new price but the change affects work elsewhere in the home, share that information with the other contractor. Ask for a description of the work including any materials or allowances you supplied, and make sure the price matches the part of the project you actually approved.

What should the builder provide with a revised price?

Request a list of new products, a warranty for the changed work and the time needed to complete it. For a construction project with revised plans, ask whether the building permit or inspections need to change. Confirm which company will provide the construction services and send your response by email with the revision number. If there is no change to the warranty, ask the builder to record that too.

What to check next

Keep the revised total and completion date together. Before paying, compare the extra invoice line with the change you actually approved.