A plumbing job handover checklist for contractors
Show the customer what was repaired and tested. Record the fixture, parts, invoice, warranty and any outstanding work. Give the owner a contact for follow-up before the technician leaves.
Walk the owner through the finished repair
Show the part you changed and the test that reproduced normal operation. Explain any areas that remain inaccessible and identify work left for another trade. Leave the owner with a written contact, the model information and the symptoms that would justify a return call.
In practice
Run the sink and let it drain while the customer can see the repaired trap. Explain what to watch for afterward.
What if the owner is absent?
Arrange an authorised recipient and send the same written summary you would give in person. Include a photo of the completed work if appropriate and specify whether any shutoff, fixture or area must await another trade.
Make the written record useful after you leave
List the fixture, installed part, location and test performed. Note any work still outstanding and who is expected to arrange it. Show the customer what normal operation looks or sounds like under the conditions that originally caused trouble. Leave the model reference, invoice number and contact for follow-up. If the owner is absent, send the same summary to the authorised recipient and document who accepted the handover.
Check the work against the approved scope
Review the estimate, agreed changes and completed work with the owner or authorised contact. Point out the fixture and parts you changed. Identify any repairs that are still outstanding or depend on another trade, such as closing a wall. A handover should make clear what the customer can use today and what must wait for a final inspection or another visit.
Demonstrate the test that matters to the customer
Show the owner how the repaired fixture operates. If the issue appeared while the sink drained, test that cycle rather than only turning on the tap. For a building installation, record relevant tests, inspected sections and any limits on access. Supply the commissioning or test record specified by the contract. Do not represent an unseen section as checked.
Prepare a simple handover package
Include the job reference, photographs the owner has agreed to receive, installed product information, invoice and warranty documents. On a larger project, include as-built drawings, manufacturer instructions and maintenance records when required. State which valves or equipment the owner may use as instructed and who handles maintenance. Record the person who received the package and the date.
Close the job in the office as well as on site
Send the office the labour, materials, test information and approved extras before closing the job. Note which documents still need to be delivered and who will deliver them. Give the client a contact for a leak, a defect or a warranty question. Keep the handover checklist with the job so staff can look up the work without asking the customer to repeat it.
What to check next
Point out the shut-off for the repaired fixture if accessible. Leave a short written note describing the test and the signs that warrant a callback.